We are one of the most-esteemed buildings construction company. We have earned this respect through the quality and long-lasting structures that we have developed over the years.

2.6 KEY RELEVANT EXPERIENCE IN THE LAST NINE (9) YEARS (2014-2023)

Relevant Experience Table
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
1. Pader Local Government Rehabilitation of Painyang-Latigi (4.78 km) climate-resilient community access road in Latanya Sub-county, Pader District Civil Earth works, Bridge Works, Box Culvert Installation September 2022 to-date
2. Bank of Uganda Renovation of Bank of Uganda, Kabale Branch Painting, Canopy Installation December 2022 to-date
3. Bank of Uganda Provision of civil and electrical works for revamping of the HR Training Room at Bank of Uganda headquarters, Kampala Ceiling Repair, Timber floor Installation, Wall Paper Application July 2022 to-date
4. Uganda Revenue Authority
Mr. Jackson Mukonyezi
Supervisor Facilities Mgt Tel: +256417442153
0772-142002
Repair of NIP Roof at Uganda Revenue Authority Headquarters, Kampala Translucent Sheet Replacement, Gutter repairs and repairs, Bituminous Painting Works March 2022 to August 2022
5. Uganda Revenue Authority
Mr. Jackson Mukonyezi
Supervisor Facilities Mgt Tel: +256417442153
0772-142002
Application of Epoxy Floor Finish at DPC, AC-FS & Fleet Office Application of Epoxy July 2022 to-date
6. Uganda Revenue Authority
Mr. Jackson Mukonyezi
Supervisor Facilities Mgt Tel: +256417442153
0772-142002
Conversion of 12 M Gap into Office Space Electrical Installations, Tank Installations, Painting Works, External Works January 2022
7. Uganda Revenue Authority (URA)
Mr Joshua. W
Tel:0772104134)
Renovation works of 40ft Container at NIP-URA Demolition Works, Painting Works, Electrical Installation July 2021 to August 2021
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
8. Uganda Revenue Authority (URA)
Mr. Joshua. W,
Tel:0772104134
Modification of Space Above URA Records Centre into additional Office Space Building construction, plumbing, electrical installations, finishes, and mechanical installations 2020 to January 2021
9. Uganda Revenue Authority (URA)
Mr. Joshua. W,
Tel:0772104134)
Partitioning of additional office space above current records Repository - URA Aluminium Partitioning June 2021 to July 2021
10. Uganda Revenue Authority (URA)
Mr. Joshua. W,
Tel:0772104134)
Construction Of Office Pre-Fab At Amudat Cue Steel Framing, Electrical Installation, EPS sandwich panels Installation June 2021 to July 2021
11. Uganda Revenue Authority (URA)
Mr. Jackson Mukonyezi
Supervisor Facilities Mgt Tel: +256417442153
0772-142002
Remedial works at URA Tower Aluminium partitioning, Steel Fabrication, Wall finishes March 2021 to January 2022
12. TotalEnergies
KIZITO Henry Sam
Mukasa Projects Engineer - Total Uganda Limited
+256 783 883890
Proposed Modernization of Total Jinja Main Street Service Station Electrical Installations, Tank Installations, Painting Works, External Works July 2021 to February 2022
13. Commissioner for Refugees (UNHCR)
Fred Muno Ochoka-
Tel: 0772981792
Email:ochakaf@unhcr.org
Construct 01 OPM Office Block, Car shade and five-stance VIP Latrine Palebek Settlement (UNHCR) Building construction, electrical installations, Finishes and Mechanical installations January 2021 to July 2021
14. Anaka General Hospital, Nwoya District Proposed Renovations for Nurses Quarters (Block A) Ceiling Repair, General Painting, Electrical & Mechanical Installations July 2022 to October 2022
15. Ivan Rogers Otiang
Field Engineer
Mercycorps Uganda
Cel: +256 776454350 |
twitter: @IOtiang Moroto | Plot 5, Lote Road, Moroto
Rehabilitation of Nadunget Livestock Market Incinerator Installation, Chain-link Installation, Landscaping, Water Tank Installation, Masonry Works May 2022 to November 2022
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
16. Eskom Uganda Limited - Eng. Anne Kitta - Tel:0772506732 Supply and Installation of power house window louvres Supply and Installation of power house window louvres March 2020
17. Eskom Uganda Limited - Eng. Anne Kitta - Tel:0772506732 Rebuilding of Risk office at Nalubaale Power Station Building construction, electrical installations, Finishes and Mechanical installations October 2020 to December 2020
18. Ministry of Agriculture, Animal Industry and Fisheries (National Livelihood Infrastructure Program) Extension of Water System (23 Km) to Kasolwe Agriculture Stock Farm in Kamuli District under National Livelihood Infrastructure Program - NLPIP) Excavations for Piping Works, Water Network Design 2020
19. Uganda National Roads Authority M/S Kuuka Investments Limited-Miss. Nakamya Jane Tel:0780601901 Periodic maintenance of selected national unpaved roads for 23 UNRA stations Periodic maintenance of selected National Unpaved roads for 23 UNRA stations August 2020
20. Wim Services Limited For Tullow Uganda (U) Limited; Mr. Allan Katumba- Tel:0782454568 Provision of Civil Works - Wellsite Repairs in North and South Exploration Areas Concrete works on the wellsite Cellers, grading and regraveling wellsite roads July 2020
21. National Teachers' College Muni, Arua Sumadhura Technologies Ltd- Uganda. - Mr.Shyam Sunder - Tel:0757957176 Construction of National Teachers College Muni (Phase II) lot3-Northern wing Construction of National Teachers College Muni (Phase II) lot3 - Northern wing October 15, 2018 - February 3, 2020
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
22. Farm Africa, - Plot 80, Kanjokya Street, Kamwokya, P.O. Box 2318, Kampala - Uganda Extension of Piped Water Scheme (21.9 Km) to Lomacar Agric Stock Farm in Kaabong District Pipework Fitting, installing flanged concentric taper, Installing flanged tee to Junctions and Branches, Installing Compression Flange adaptor to HDPE pipe spigots, Concrete and Formwork Finishes July 2020
23. Eskom Uganda Limited - Eng. Anne Kitta -Tel:0772506732 Painting of transformers at Nalubaale Power Station Painting of transformers at Nalubaale Power Station October 2019
24. Eskom Uganda Limited - Eng. Anne Kitta -Tel:0772506732 Supply of scaffolding material Supply of Scaffolding material for Unit 14 and Unit 15 Civil works January 2019
25. Ministry of Works & Transport - Eng. Joseph Rutagi Supply of Stone aggregate size 14/20 MML Supply of Stone aggregate size 14/20 MML for National Trade Show Grounds in Jinja district May 2019
26. Ministry of Works & Transport - Eng. Joseph Rutagi Supply of fill material Supply of fill material for upgrading to bitumen standards of Chebrot Road in Kapchorwa September 2019
27. Home Bliss Hotel, Fort Portal Construction of Home Bliss Hotel 8 Cottages, Kitchen, Laundry, Boundary walling, Paving and Landscaping Works Construction of Home Bliss Hotel 8 Cottages, Kitchen, Laundry, Boundary walling, Paving and Landscaping Works May 11, 2019 - May 21, 2020
28. American Refugee Committee- P.o.Box 112, Naguru Kampala Extension Of Piped Water Scheme In Ariwa Health Center Iv Bidibidi Settlement, Yumbe District Pressure Testing, Placing of Concrete Works, Steel Reinforcement Works, Pipe Work Fittings to bends, Pipe Work Fittings to Junctions and Branches, installation of pressure switches to pump mains 2018
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
29. Proess Limited - Eng. Micheal Daka Tel:0782819688 Sub-Consultancy service for GET FIT Power Evacuation and Grid Interconnection Project Construction Supervision of the GET FIT Power Evacuation and Grid Interconnection Project February 2018 to-date
30. Eskom Uganda Limited - Eng. Anne Kitta -Tel:0772506732 NPS/KPS perimeter fence repair works -Uganda NPS/KPS fence repair and piezometer base concreting August 2018
31. Kalangala Infrastructure Services Limited - Mr. Bruno Mugabe - Tel: 0772358316 Infrastructure Maintenance works at KIS- Kalangala - Uganda Power plant concrete works, Storage yard facilities and ferry facilities April 2018
32. Samaritan's Purse International Relief- Plot 11, Luthuli Drive, Bugolobi, Kampala Works Contract For Extension Of Piped Water To Zone 2 And Zone 3 Bidibidi Settlement Area. Pipe Excavation, Pipework Fitting, installing flanged concentric taper, Installing flanged tee to Junctions and Branches September 2017
33. Wim Services Limited - Mr. Allan Katumba Drainage Works at Tangi and Bugungu Camp Drainage Works at Tangi and Bugungu Camp (Culvert installation, stone pitching and HDPE lining) November 2017
34. Total E&P Uganda Eng. Rodney Atuhaire TEL:0777753551 Construction of Steel Framed Warehouse at Tangi Consolidated Yard Building construction, electrical installations, Finishes and Mechanical Installations September 2017
35. Total E&P Uganda Eng. Rodney Atuhaire TEL:0777753551 Spot repairs of gravel access roads from UWA Tangi gate - Pakuba lodge junction - Pakuba junction (15.8km) in Nwoya District Opening, grading, gravelling and drainage works January 2017
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
36. Taikai Shadongo Power Engineering - Mr. Felix Lee Construction of 200kV Kawanda - Masaka and Mbarara substations Substation access, Control room, roads and Civil works June 2016
37. KEC International - Mr. Tulkudar. T Construction of tower foundations and access roads Construction of Tower foundations and access roads within the transmission line - Uganda May 2016
38. UMEME - Eng. Bunty. E Geotechnical investigations for the design of Namugogo substation and construction supervision of the substation - Uganda Electric resistivity surveys, soil properties and subcontracted construction of the substation April 2016
39. Total E&P Uganda - Eng. Rodney Atuhaire TEL:0777753551 Construction of Steel framed Warehouse for drilling equipment at Adundu camp Building construction, electrical installations, Finishes and Mechanical installations September 2015
40. Total E&P Uganda - Eng. Rodney Atuhaire TEL:0777753551 Rehabilitation of gravel access roads from UWA gate - Mubaku-Ajigo-Avegera (14.4km) in Buliisa district for rig Opening, grading, gravelling and drainage works August 2015
41. Uganda Wildlife Authority- Mr. Tom Okello Opening and Rehabilitation of Tourism roads (18.7 km) in Murchison Falls National Park. Opening, grading, gravelling, drainage works April 2015
42. Ministry of Works & Transport - Eng. Robert Lwanga Rehabilitation, swamp raising, Bridge Works and Sport stone pitching of Acandyang-Adagayela - Adon Road (8.2km) - Apac District Re-grading, Re-gravelling, bridge construction, spot pitching September 2014
NAME OF CLIENT & CONTACT PERSON PROJECT NAME WORK DONE YEAR OF COMPLETION
43. World Vision uganda
Olara Denis Micheal
Tel: +256 765356095,
Email: +256 708899155
engdenis77@gmail.com
Nankoma Solar powered Piped Water Supply System, Bugiri District construction of substructure, reservoir tower erection, tank installation, pipe laying and backfill, finishes, submersible pump installation, solar panels, chlorine doser February 2020
44. Sharin Company
Eng. Kidega Geofrey Willy
Tel: +256 (0)772428203
Email:gwkidega@gmail.com
Rehabilitation of water supply system in Sinjar District, Iraq Rehabilitation of five concrete reservoirs, construction of PN16 PE transmission pipe, PN10 PE distribution main pipe, construction of two pump houses and pumping area, solar panels March 2022
45. Mercy Corps Uganda
Okwi Micheal
Tel: +256 (0) 414501 014
Email Address:
mokwii@mercycorps.org
Rehabilitation Of Community Hall To House Milk Cooling Plant substructure, steel works, concrete works, drainange works, finishes, tank installation and water pipe laying 2023
46. National water and Sewage corporation
Eng. Jude Mwoga
Feasibility study and detailed design and remodelling of the existing block at NWSC WESREC feasibility study, geotechnical investigation, topographic survey, Detailed drawings, priced BOQ, tender document preparation May 2023
47. Government of South Sudan
Malong Deng Garang Director Roads & Bridges
Consultancy Services for Design and Extension of Piped Water scheme (27.9 Km) to the HQ Ministry of Road transport and Bridges, Republic of South sudan Feasibility study, geotechnical investigation, topographic survey, Detailed drawings, priced BOQ, tender document preparation 2017
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare
Open chat
Hello 👋
Can we help you?